Yorkshire Regional Network
Barnsley Hub β Sheffield • Huddersfield • Leeds
Tri-junction topology & real-time tracking engine active
Default Corridor Focus: South Yorkshire Corridor (Barnsley β Mexborough β Meadowhall β Sheffield).
Renderer: Hardware-accelerated HTML5 Canvas 2D @ 60 FPS.
Phase 1 Alerting: Email notifications via Brevo ([email protected]) are active.
Traffic passes from Host Nginx (Ports 80/443) β Docker Container (127.0.0.1:5050). Real Client IP is resolved from X-Forwarded-For and inspected in memory before request execution.
Feed Strategy: Duplicated from NetLogger architecture. Queries AbuseIPDB blacklist API with confidenceMinimum: 90% (confirmed high-confidence malicious actors only) with fallback to FireHOL Level 1 Netsets.
Last Synchronized: Never
| IP / CIDR Block | Reason | Type | Added By | Action |
|---|---|---|---|---|
| Loading block rules... | ||||
| CVE / Advisory | Component | CVSS / Severity | Remediation Action | Status |
|---|---|---|---|---|
| Loading advisories... | ||||
Changes saved here update the database in real-time. Any browser visiting the site or refreshing immediately renders the new railway layout.